Changes
The Changes screen is a diary of what changed in your repos, week by week. Your boards show the system as it is; Changes shows what moved on it, and who the move reaches. Each diary entry is one piece of work in one repo's week: what it did, where it landed, who did it, and the change rules it hit.
The code plugin records each week from git, on every scheduled /analyze or with /changes. The Changes card on the root hub and on each app hub sums up the same entries beside the board's canvas painted with them. Every other way into a change opens here.
- 1
The weeks
Each week stacks its entries by kind, flagged and breaking ones at the foot, and the key under the weeks counts each kind.
- 2
List, Timeline and Map
Three views of the same entries, beside Replay the weeks.
- 3
Filters and the app picker
Four filters narrow the list, each with its count, and on the root board a picker narrows it to one app.
- 4
The days
Each row gives the days its commits landed, then its commits and who did it.
- 5
The open entry
Select an entry to open it beside the list.
Set up
In each app's repo, create the scheduled task /start prints, so /analyze runs as a scheduled run. Each run refreshes the boards whose code changed, syncs them, and records the weeks since the last run. The diary keeps up with the code without anyone running a command.
The first run reads the git history back as far as the workspace's Read history back setting, 90 days by default, and records one change period per week. After that, each run records the weeks since the last one and rewrites the current one.
To record the weeks straight away, or in a repo without a schedule, run /changes. It records the same change periods without refreshing the boards.
Four Reporting settings shape the diary. Three are Change periods (weeks or calendar months), Read history back and Keep change periods. The fourth, Look back, sets how far back a node's diary entries reach and how old a period can be and still raise a flag. See Workspace Settings.
Record the weeks
A change period is one repo's record of one week or month. It holds the commits, who made them with which coding agent, each change rule's answer, and the pieces of work the commits group into. /changes reads the bound branch's history and records every period ProvenMap doesn't have yet. A closed period already recorded is skipped; the current one is rewritten each time.
/changes groups a week's commits into pieces of work, and each piece becomes one diary entry:
- A commit joins the piece named by its conventional-commit scope:
feat(hub): …joinshub. - A commit with no scope joins the node most of its files belong to.
- The rest go into
other changes.
A repo keeps at most eight pieces of work a week, the largest first. The diary counts the commits in the smaller ones it left out.
Each piece of work also records the days its first and last commits landed, in UTC. A week recorded before pieces of work carried their days has none: its entries name the week's dates, and the timeline draws them across the whole week. /changes --recompute gives a recorded week its days.
The agent running the command writes the words: each piece's headline and what it did, and for each rule it hit, its impact. It also writes what changed for each rule answered Changed. Each sentence names an area of work, never an amount, and never compares people; anything the commit messages can't support is left empty. A scheduled run writes them for every period it records, the same as /changes.
Commit messages and the full file lists stay on your machine. Only the record is pushed: the counts, the sentences, and at most five names and five paths per rule. The code plugin covers what /changes reports and where the other commands mention it.
Read the diary
The Changes tab is on every app board and on the root board. Its Diary tab lists the entries of every week the period control reaches; on the root board it covers every app in the tree.
The row of weeks at the top is the weeks the period control reaches, or months on a workspace that reports monthly. Each column stacks that week's entries by kind, Flag to review and Breaks callers at the foot, so you can see which week to open before you open it. Where a column is wide enough, the week's commits and the share naming a coding agent sit under its date. The key under the weeks counts each kind in what's listed. Select a week to list only its entries, and select it again to go back to the whole period.
Four filters narrow the list, each with its count:
- All: every entry.
- Contracts: entries that hit Schema or API contract.
- Breaking or flagged: entries marked Flag to review or Breaks callers.
- Your rules: entries that hit a rule your organization added.
On the root board, when more than one app has entries, a picker also narrows the list to one app.
Beside the filters, List, Timeline and Map draw the same entries three ways: ranked as a list, on the days their commits landed, or painted on the board's canvas. The row of weeks picks the weeks for all three. The view you pick stays in the page's address, so a link opens the same view.
Replay the weeks steps through the row a week at a time, oldest first, and the open view follows each step. Stop ends the replay, and so does selecting a week.
Entries are ranked by their mark, then by commits:
Each row gives the headline and what the work did. Then come the days its commits landed, such as Sep 23 – Sep 25, its commits and how many name an agent, and who did it. An entry with no days of its own gives its week's dates. A chip per rule shows its impact, such as API contract · breaking.
An entry that changed a contract also names the other apps that depend on what it touched, such as Portal and Plugins depend on it. Where no app can be named, it says how many systems depend on its app instead.
Under the list, a line counts the commits in smaller pieces of work no entry lists. On the root board, Worked these weeks names each app with its commits. With one week selected, it reads Worked this week. Nothing recorded names each app with no period in those weeks, and the date of its last one. An app there hasn't run /changes, which isn't the same as doing nothing.
Coupling
Under the list, Coupling says how tied each app is to the others. It counts the elements in other apps that depend on something in it and the ones it depends on, and names its most depended-on nodes, such as Pricing 7. The counts are as the last /changes run found them while the week was open. Where an earlier week was sampled, each count shows the change, such as 12 → 19. A week no run sampled shows no count rather than zero.
Coupling is a fact to read, never a verdict: no threshold says how much is too much, and it raises no flag.
Not checked this week
Not checked this week lists what the week's record could not see, so a quiet week is not mistaken for a safe one:
- No boundary rules are declared, so none could break. Declare them on the app's Boundaries tab.
- No sync proved the boundary rules. The app has rules, but no
/syncran in the week to check them. - No API clients, events or tables are adopted, so calls between apps go unseen. Run
/aspectsin the repo. - Coupling was not sampled. No
/changesrun read the app while the week was open. - Calls made only at runtime, such as config routing or a service mesh. These are never read, so this line is always there.
On the root board each line names the apps it applies to.
Point at an entry with the board map open, and the map rings the boards it landed on. With the map closed, the Map button rings once instead, so you know there is something to see. While the diary is open, the map also shows each app's commits for the listed weeks beside its row.
Entries that aren't a piece of work
A week recorded before /changes grouped commits into pieces of work has one entry per rule that answered Changed, with no people and no impact. A rule answered Changed that no listed piece of work hit gets an entry of its own. Structure, answered from pushes, is the usual one.
Boundaries is always its own entry, since no piece of work claims it.
Read the weeks on a timeline
Timeline lays the listed weeks out on their days. On the root board each app has a lane. In an app each node the work landed on has one, and Across the app holds entries tied to no node. Each piece of work is a bar from its first commit's day to its last, in UTC.
Breaks callers bars are red and Flag to review bars amber, each with its mark where the bar has room. A thicker bar has more commits: one, two to five, or six and more. Work that overlaps stacks into rows rather than hiding.
An entry with no days of its own is drawn hollow across its whole week, and a line under the lanes counts them. In a week that hasn't ended, a dashed line marks now.
Point at a bar for a summary of the entry, with Read the entry to open it beside the timeline. Selecting the bar opens it too.
Paint the weeks on the canvas
Map paints the listed weeks on the board's canvas, read-only. On the root board that is the root canvas, one system per app; in an app, the app board's own canvas. The entry you open lights where it landed and the rest of the canvas dims; on the root it lights the app's system and the systems that depend on it. Under the canvas, a line names who depends on it.
A node on the depending side of a broken boundary rule carries a red mark, ringed in red when the rule broke in the listed weeks rather than before them.
The lenses are the ones the hub's Architecture card offers: Commits, and Autopilot and Drawing vs code once there is data for them. Select the canvas to open it.
Open an entry
Select an entry to open it beside the list or the timeline, or under it on a narrow screen. Its header gives the mark, the app and the days its commits landed, or the week for an entry with no days of its own. Then come the headline and what the work did, its commits, and what grouped them, shown as grouped as hub.
Below the header, in order:
- Where it landed: the nodes its files belong to. Select one to open it on the canvas. A node the analysis no longer has is shown dashed.
- Who: each person with the coding agent their commits name.
- Who depends on it · today: shown only when the entry changed a contract. It lists the systems that depend on the app's system, then those one step further out, each with the system in between, such as Storefront · through Orders. See Who depends on a change.
- Reaches other apps · today: shown when the entry changed a contract. Each app that depends on what the work touched, with its clients, subscribers or readers, and the endpoints, events or tables they go through. It lists up to six apps and three of each per app, then counts the rest. Select an app to open its hub. See What in other apps a change reaches.
- Rules it hit: each rule with its impact, the names and paths behind it, and Mark reviewed on an open flag. A rule your organization added reads your rule.
- Work items: Asked for lists the work items the commits cite, when the repo cites work items at all. Made from it lists the work items made from this entry, each with its status. Under them, Make a work item drafts one. See Make a work item from an entry.
Make a work item from an entry
Needs Create work items on the app the work item goes on. Read-only members don't see the door.
A change that already happened can still owe work: a follow-up in the app that made it, or a change in an app that depends on what it touched. Open the entry and choose Make a work item under Work items. When other apps depend on the change, the button reads Make a work item on and lists the app that changed first, then each app that depends on it.
The work item lands as a Draft on the app you chose, with the entry as its evidence: what the work did, where it landed, the rules it hit with their names and paths, and, on an app that depends on it, which of its clients, subscribers or readers depend on what changed. Those elements, and the nodes the change landed on, are attached as context. Its instructions open with the decision left to you: what the app owes after this change. Write it in the editor, then hand it off as usual. A breaking or flagged change drafts a Fix; any other change drafts a Task.
Beside it, Send to Jira… drafts the same work item and sends it to Jira as an issue in one step. See Send to Jira. Share to Slack… posts the entry to a channel without making a work item. See Share to Slack.
The work item keeps the change as its origin. Its Origin section names the week and the entry's headline, and opens that week on the Changes screen. The entry lists the work item under Made from it with its status, and keeps listing it after /changes --recompute rewrites the week, as long as the piece of work is grouped under the same name.
Impact
The agent running /changes writes one word for each rule a piece of work hit, from its commits:
When the commits don't say which, the rule reads impact not written.
Who depends on a change
Who depends on an app comes from two places: the calls and events adopted from each app, and the edges drawn between systems on the root canvas. It is read when you open the entry, not when the change was recorded, which is why the section says today. People and roles drawn on the canvas, such as an end user, aren't counted: they use a system rather than depend on its contract. With neither source, the entry says nothing shows who depends on the app, rather than claiming nobody does.
What in other apps a change reaches
Who depends on it answers for the app as a whole. Reaches other apps answers for what the change touched, element by element, from the aspects each app adopted:
A change reaches these two ways:
- A table the Schema rule named, read from the changed migration. This is the exact table.
- An endpoint or event served by a node the work landed on, or by a node in its layer. The change may not have touched that endpoint, so the section says Served by a node this work landed on; the change may not touch these parts.
Edges drawn on a canvas aren't followed: they say an app depends on another, not on which part. Only a change that hit Schema or API contract is checked. Like who depends on a change, it is read when you open the entry, which is why the section says today. When it finds nothing, it says no adopted client, subscriber or reader in another app depends on what the change touched. An app counts once its clients, events or tables are adopted with /aspects.
On an app hub, the Changes card has a From other apps filter. It lists the changes in other apps over the hub's period that reach this one, up to 20, newest first. Each one's View detail opens it on the Changes screen of the app that made it.
Review a flag
Infrastructure is critical: a Changed answer raises a flag. The entry ranks first as Flag to review. The app hub's attention queue and the root hub's Fleet attention each get a row for it. Open change on the row opens the entry.
Choose Mark reviewed beside the rule in the entry, or on the attention queue's row. The rule then reads Reviewed with the date and who reviewed it. A flag is raised only for a period that ended inside the workspace's Look back window, so recording last year's history doesn't fill the queue.
A review holds when /changes rewrites the open week and the rule's answer is the same: the same names, paths and counts. New evidence opens the flag again.
When a boundary breaks
Boundaries asks whether the app still keeps the boundary rules declared for it. Each /sync proves every rule, and the week records each rule that moved:
A rule's first verdict, after it is declared or its definition edited, is not a move: declaring a rule over code that already crosses it doesn't raise a flag.
The week's Boundaries entry sums it up, such as 1 broke, 2 hold again · 5 of 7 hold after the last sync.
Boundaries is critical, and only a rule still broken when the week ends raises a flag: the entry ranks first as Flag to review. A rule fixed inside the week is told without a flag, and holding again is good news with nothing to review.
Open the entry for its Boundary rules, broken ones first. Each opens its rule on the Boundaries tab, with the crossings that broke it and their evidence. If the crossing was meant, choose Mark reviewed and change the rule. If not, make a work item from the entry; once the fix merges, the next /sync marks the rule Holds and the week records it as holding again.
Other ways in
Every other place that tells a change opens it on the Changes screen:
- The Changes card on a hub (changed 25 October 2026): View detail on an entry, or Open in Changes.
- The Timeline card, when a hub has it: Open in Changes in a bar's summary opens the entry in the Timeline view.
- The Entry card, when a hub has it: Open in Changes.
- The attention queue and Fleet attention: Open change on a flag's row.
- A push session's footprint: What changed names the week the push landed in and opens that repo's entries for it.
- The node inspector: a node that diary entries name shows In N diary entries with the newest. Select it to open it, or open the app's Changes.
- The System scorecard: its three change cells open Changes.
- The Monday briefing: each entry it names links to it.
People and agents, and Most changed
The People and agents and Most changed tabs read the same change periods, by app, over the period the control in the screen's header sets. Change Cards covers what each shows.
Change rules
A change rule is a question each period answers about what changed, with Changed or No change. Seven are provided:
Rules your organization adds run beside these, and the Your rules filter shows the entries that hit them. A rule answered from files gives the same answer on every run. Its names come from the file names, so a migration named 0042_add_idempotency_keys.sql reads "add idempotency keys". In a period with no sync in it, four rules have no answer: Structure, AI surface, Authorization and Boundaries. The diary makes no entry from them. Infrastructure and Boundaries are critical.
Add or change a rule
Owners and admins only. Everyone else sees the rules read-only.
Your organization's rules are in Organization settings → Change Rules, one list for every repo. /changes reads them on each run, so a change reaches every repo on its next run.
- 1
Rules on
At most eight rules are on at once, and the header counts them.
- 2
The switch
The switch beside a rule turns it off or on.
- 3
Customize (the pencil)
Choosing Customize saves your organization's own copy, marked Customized.
Choose New rule and fill in its Name, a Slug (fixed once saved), the Question it asks and what it's Answered from. In When the answer is Changed, say what the agent running /changes should write about the change, up to 600 characters. A rule is answered from one of two places:
The provided Boundaries rule is answered from Boundary rules, which has nothing to set: customizing it changes its name, question, what to write and whether it is critical.
Two fields serve comparisons. Under Compared across apps, pick the kinds of contract the rule compares when two apps are put side by side: tables, endpoints, channels, pages or clients.
The field Reads as Changed when says how deep that comparison reads. At Interface, a column, parameter, response status or event type present on one side only reads as Changed, and a type or schema spelled differently is a note. At Shape, those notes read as Changed too. The provided Schema rule compares tables and API contract compares endpoints and channels, both at Interface.
Turn on Critical and a Changed answer raises a flag. The switch beside a rule turns it off or on; at most eight rules are on at once, and the header counts them, such as 5 of 8 on.
Each rule is marked Provided, Customized or Your rule. A provided rule can be switched off but not deleted. Choosing Customize saves your organization's own copy, marked Customized, and Reset to provided brings the provided rule back. Edit changes a rule your organization added, and Delete removes it.
Periods already recorded keep the answers they were given. The next /changes run answers with the edited rule, and /changes --recompute rewrites the closed periods with it.
Work items behind a piece of work
/changes reads the work item numbers a commit message cites, #12 or WI-12, anywhere in it. It skips the (#4480) GitHub adds to a squash merge, which names the pull request. ProvenMap keeps a number only when it names a work item on that app's own boards, created before the period ended.
An entry lists those work items under Asked for. The list shows only for a repo whose commits cite work items at some point in the diary's weeks. In a repo that never cites them, an empty list would say nothing. The System scorecard counts the periods with commits and no work item behind them; a work item a push in the period completed or verified counts too.
Limits
- The bound branch only. Work on other branches counts once it is merged.
- History moves with git. A rebase moves commits between periods; a squash merge drops co-authors the squash didn't keep.
- A shallow clone can't reach the start of a period, so that period's counts are incomplete.
- Boundaries reads an app's own rules. The root board's rules are proven without a repo, so no week records them.
- Coupling is as of the last run. A week's coupling is what the last
/changesrun found while the week was open. Calls made only at runtime aren't in it. - Nodes are mapped with today's analysis, so a renamed service counts under its current name.
- Coding agents are recognised from a fixed list of the names and addresses they commit under, as the author or in a
Co-Authored-Bytrailer: Claude, Codex, Cursor, Copilot and others. Each shows under one name, whatever model or version signed. A commit no listed agent authored or co-signed names no agent. - A piece of work is a grouping by scope or node, not by intent. Two pieces of work under one scope are one entry.
- Per piece of work: 5 nodes, 4 person-and-agent pairs, 10 cited work items and an 80-character headline.
- Per period: 8 pieces of work, 10 person-and-agent pairs, 20 services, 5 names and 5 paths per rule, 20 cited work items, and 400 characters per sentence. Past a cap, the record counts the people and services it left out, and the diary counts the commits in the pieces of work it left out. Names, paths and work items past a cap are dropped.
FAQ
Why does an entry say impact not written?
The agent running /changes couldn't tell from the commits how the change lands on others, or the period was recorded with --facts-only. Run /changes --recompute in the repo to write it again.
Why does an entry have no people?
Its week was recorded before /changes grouped commits into pieces of work, so the record never said who did which part. /changes --recompute rewrites closed weeks from git.
Why does a link to an entry say it is no longer recorded?
Its week was recomputed, which can regroup its commits, or it fell outside Keep change periods.
Does Boundaries see calls made at runtime?
No. A rule is proven from imports, adopted API clients, events and tables, and the edges on the board. A call routed by configuration or a service mesh is invisible to it, which is why Not checked this week always names runtime calls.
Why did a rule break and hold again in the same week?
An agent's change crossed it and a later change in the week fixed it. The week tells it as Broke, holds again, without a flag, so the crossing is still on record.
Can I record change periods for another branch?
No. A change period follows the branch the repo is bound to.
Can I edit an entry?
No. Everything on an entry is computed from git or from the syncs in its week, apart from the words the agent wrote. To rewrite a closed week, run /changes --recompute in the repo.
What's next
The Root Hub
The Changes card on the root hub, beside the root canvas.
Change Cards
The cards that count change over the hub's period.
Scheduled Runs
Keep the diary current without running a command.
Use case · Plan a change
Assess the impact of a proposed architecture change
A change drawn and decided before anyone builds it, then seen landing in that week's diary entry.
Usually an architect or CTO, with the engineering lead and product
Use case · Document and explain
Keep software architecture documentation up to date
A scheduled analysis that redraws the board and records each week's changes, with no one running a command.
Usually an architect or a tech lead, for the whole team